FLORIDA SOUND ENGINEERING CO. - Jacksonville, Florida - "How shall they hear without a great sound system?"
HOME
PRODUCTS
SERVICES
SHOWCASE
OUR HISTORY
SOUND TIPS
NEWS
CONTACT US
SEARCH

 

 You are in the Alltel Stadium showcase

This picture gallery shows various stages of sound system installation at the Alltel Stadium in Jacksonville, Florida.  Florida Sound installed the system and is still the exclusive provider of maintenance. This stadium is home to the NFL Jacksonville Jaguars.  Visit their award winning site for a tour of the completed stadium and team statistics.

STADIUM FACTS Provided by Jacksonville.Com
Date opened: August 18, 1995
Cost: $138 million (municipal bonds)
Total seats: 73,000
Club seats: 10,000
Suites: 85
Locker rooms: 5 (three for players, two for officials)
Lighting: 400 2000-watt lights
Scoreboards: 2 (60' high x 156' wide, 14' deep)
Playing surface: GN-1 Tifway grass
First regular season game: Jacksonville vs. Houston, September 3, 1995

Alltel Stadium during construction

Equipment racks at Alltel Stadium in the amplification room.  These racks contain amplifiers, signal processing, patch bays, and other sound equipment.

Inside the control room at Alltel Stadium

Everything we do is by design

 ^ Back to top ^

[Home] [Products] [Services] [Showcase] [Tips] [News]
 [Contact] [Search/Site Map] [Broken Link] [Privacy Policy]

© 2000-2005 by Florida Sound Engineering Company, Inc.

Last modified:
  September 23, 2003